[单选题]

A shortage of OPEC oil at current market prices will increase oil prices because of().

A.the law of elastic supply

B.the law of elastic demand

C.consumers will bid up the price of oil

D.all of the above

E.none of the above

答案
查看答案
更多“A shortage of OPEC oil at current market prices will increase oil prices because of().”相关的问题

第1题

All of the following words are acronyms except().

A.ad

B.OPEC

C.NATO

D.UNESCO

点击查看答案

第2题

国际垄断组织OPEC以限产、控制橡胶供给来控制国际市场上橡胶价格从而保护自己的利益。()
点击查看答案

第3题

以下那些因素会影响短期供给曲线()。

A.资源价格短期变动

B.主要粮产区大面积洪涝灾害

C.OPEC停产限价

D.以上都是

点击查看答案

第4题

欧佩克(OPEC)是一个稳定的、政府间石油供应组织,下列藐视属于欧佩克石油政策经历的发展阶段的是()。

A.提价保值战略

B.限产保价战略

C.低价保额战略

D.维持市场适度紧张战略

点击查看答案

第5题

We have to accept the fact()there is a shortage of qualified teachers in the countrysi

A.that

B.because

C.which

D.since

点击查看答案

第6题

At that time, in many countries there was() not enough gas and oil.

A.a surplus of

B.surplus of

C.shortage of

D.a shortage of

点击查看答案

第7题

7Which of the following does not contribute to increased Schedule Risk? A.labor shortage B

7 Which of the following does not contribute to increased Schedule Risk?

A. labor shortage

B. contractor claims

C. lack of access

D. sponsor scope changes

E. all may increase schedule risk

点击查看答案

第8题

125Which of the following does not contribute to increased Schedule Risk? A.labor shortage

125 Which of the following does not contribute to increased Schedule Risk?

A. labor shortage

B. contractor claims

C. lack of access

D. sponsor scope changes

E. all may increase schedule risk

点击查看答案

第9题

Which of the conditions listed will cause a refrigeration compressor to run constantly
without simultaneously decreasing the temperature in the refrigerated space?()

A.Shortage of refrigerant oil

B.Slight shortage of refrigerant

C.Excessive condenser cooling water flow

D.Faulty expansion valve

点击查看答案

第10题

Which of the following does not contribute to increased Schedule Risk?Alabor shortageBcont

Which of the following does not contribute to increased Schedule Risk?

A labor shortage

B contractor claims

C lack of access

D sponsor scope changes

E all may increase schedule risk

点击查看答案
下载APP
关注公众号
TOP
重置密码
账号:
旧密码:
新密码:
确认密码:
确认修改
购买搜题卡查看答案 购买前请仔细阅读《购买须知》
请选择支付方式
  • 微信支付
  • 支付宝支付
点击支付即表示同意并接受了《服务协议》《购买须知》
立即支付 系统将自动为您注册账号
已付款,但不能查看答案,请点这里登录即可>>>
请使用微信扫码支付(元)

订单号:

遇到问题请联系在线客服

请不要关闭本页面,支付完成后请点击【支付完成】按钮
遇到问题请联系在线客服
恭喜您,购买搜题卡成功 系统为您生成的账号密码如下:
重要提示:请勿将账号共享给其他人使用,违者账号将被封禁。
发送账号到微信 保存账号查看答案
怕账号密码记不住?建议关注微信公众号绑定微信,开通微信扫码登录功能
请用微信扫码测试
优题宝